Patoly buyer guide
Outdoor Kitchen Pods: Voltage, Gas & Import Checklist
Prepare a utility schedule and model-specific documentation request for your destination market.
Quick answer
Before ordering, obtain the site's voltage, frequency, electrical connection, gas type and supply pressure. Give these to the supplier and your qualified local installer. Request an equipment schedule and destination-specific documentation for the exact configuration. A plug adapter or a certificate for one component does not establish suitability of the assembled kitchen.
Start with the site supply
Ask the site's electrical contractor to describe the available supply and the requirements for the proposed equipment. Country names alone are insufficient: connection arrangements, protective devices and available circuit capacity depend on the site and the equipment selected. Record voltage, frequency, connection type and the rated load of each appliance.
Refrigeration, lighting, controls and canopy drives can have different requirements. Request model numbers and rating information for the proposed components. A travel adapter changes the connection shape; it does not establish that the appliance is compatible with the supply. Have the final schedule checked before production and before connection on site.
- Site voltage and frequency
- Connection and protective-device requirements from the local installer
- Equipment model numbers and rated loads
- Service access and isolation requirements
Specify the actual gas installation
Tell the supplier whether the project uses LPG or natural gas, and provide the supply details obtained by your installer. Ask for the grill model, fuel configuration and installation instructions. Regulators, connections, ventilation and clearances must be assessed for that equipment and destination.
Do not assume that the selected grill supports both fuels or that it can be converted locally. Any conversion needs an appliance-approved method and suitable local expertise. An outdoor setting does not remove the need to review the effect of an enclosure or overhead canopy on appliance installation requirements.
Request documents for the configuration you will receive
Make a document checklist with your importer, customs broker and local installer. Ask the supplier which documents cover each appliance and which cover the assembled system, if applicable. Check the named manufacturer, model, version and document scope against your quotation.
A familiar certification logo is not a substitute for that review. The documentation needed can differ by destination, intended use and component. Do not assume that a component certificate applies to the entire pod or that a generic factory certificate settles all import and installation requirements.
Freeze the schedule before production
Attach the approved equipment list, site utility schedule and drawings to the commercial order. Agree how substitutions will be approved and what information will be included in the pre-dispatch inspection. Record warranty responsibilities for electrical, gas and other equipment separately where appropriate.
If you are sourcing multiple units, identify the destination and configuration of each unit. Clear order records help your receiving and service teams match the delivered equipment to the intended site.
- Signed-off equipment and utility schedule
- Destination and configuration per unit
- Required documents and inspection deliverables
- Local installation and commissioning responsibilities
Turn the checklist into a project brief
Explore the Modular Outdoor BBQ Kitchen Pod reference, then send your destination, available space and equipment needs. Specifications and commercial terms are confirmed per project. Compare the B9 Outdoor Kitchen System reference or use our kitchen planner to prepare your layout and feature brief.
This guide supports a procurement discussion. Follow the instructions for the selected equipment and have the final site and utility plan assessed by qualified local professionals.